Scaffolding Pipes & Fittings
  • Top Manufacturer for Scaffolds
  • Factory for More Than 20 Years
  • Meet All Your Demands at One-Stop

Pipe & Fitting Scaffold

The Pipe & Fitting scaffold (commonly called tube & coupler scaffold) is a traditional system with a long history. With the scaffolding pipes and the fittings used to connect the pipes, the scaffolding system can be easily set up to the specified height and width. The vertical tubes are connected to the horizontals by the right-angle couplers (also named double couplers), while the diagonal bracing pipes are attached to the scaffold via swivel clamps. This kind of scaffold is stable and flexible for usage, but it is not as quick as the other system scaffolds set up at the construction site.

WanChengTai has the auto welding line for the scaffolding tubes in the factory together with the tube galvanizing production lines. And we manufacture drop forged scaffolding couplers instead of the pressed ones. We apply different tests to the couplers for each production batch to guarantee the couplers we manufactured to meet the scaffolding standards, such as EN74, BS1139, AS/NZS1576, etc.

 WanChengTai(WCT) is a top manufacturer of scaffolding products in China. We manufacture scaffolding systems that encompass the full range of components. With WCT, you can acquire off-the-shelf scaffoldings as well as customized parts for individual requirements.

WCT’s Pipe & Fitting scaffold parts include but are not limited to the following products.

Still not finding what you’re looking for?
Contact our consultants for more available products.

Advantages of WCT Scaffolding Systems

Wide Range of Products

WCT has manufactured all kinds of products for scaffolds. At one stop, you can get everything you need, from base jacks to board brackets to the platforms.

High-Capacity Production

With more than 100,000m2 of workshops and warehouses, WCT is able to meet your production needs in a timely manner, including urgent orders.

Automated Production Lines

We have more than 20 auto welding lines for scaffolding manufacture as well as four auto forming lines for scaffolding planks in the factory.

Conscientious QC Flows

The QC executive processes of WCT cover every flow of the production. We handle your orders from raw materials to manufacturing processes to packaging and shipping.

WanChengTai has equipped our factory with the auto drop forging production line and more than 20 automated welding lines used for the scaffolding production. And those modern production machines guarantee the quality consistency of our scaffoldings.

Get A Quote

From the scaffolding tubes to the drop forged couplers, including base jacks and planks, WanChengTai completes the hot-dip galvanizing treatment in our own workshop. And with these galvanizing lines, we can lower the surface finishing cost, shorten the production period, and improve the galvanizing surface quality.

Get A Quote

WanChengTai takes care of your scaffoldings. Our quality control processes cover every aspect, raw materials, production procedures, mass production, surface finishing, packaging, and container loading. These procedures ensure that our scaffolds are manufactured with high quality, starting with the appearance check to dimensional inspection and mechanical properties test.

Get A Quote

FAQ

Do you have any certificates for your scaffolds?

Yes. WanChengTai has certificates based on the following standards: ANSI/SSFI SC100 for Ringlock scaffolds; AS/NZS 1576 for Kwikstage scaffolds; AS/NZS 1576 for Aluminum scaffolds; AS 3610 for shoring frames & props.

How do you package the cargoes?

There are several packaging methods available, including bundles, pallets, racks, and racks with mesh.

Do you have abilities to manufacture customized scaffolds?

Yes. We have a strong technical team with rich experiences. If you have your own design, send us the drawings, and leave the rest operation to us. We will handle it.

Can you provide samples for us?

Yes, we can. Let us know your request, and we will follow up.

What about your normal lead time for regular scaffoldings?

Our capacity is 2000 tons per month. And for regular scaffolds, we can arrange delivery for you within 30 days.

What kind of material are you using for your scaffolds?

We only take Chinese steel Q345(equivalent to 16Mn) for the scaffolding standards. And for other parts, both Q345 and Q235 are available.

What about the prices of your scaffolds?

Speaking with solid self-confidence, our price is very reasonable and competitive. Leave us your inquiry, and we will send our price list for your reference.

Can you tell me the price per square meter?

We are selling our scaffolding piece by piece. It is unavailable for a price per square meter.

Can you contract any projects with your scaffoldings?

We do not have the services of contracting. But you can acquire projects with our scaffolds. We will do our best to assist you.

Can you tell me how many pieces of each necessary scaffolding part are needed for a building?

We can roughly but not precisely make a calculation. But it is just for reference. We strongly recommend talking with your local scaffolding engineers if you want a clear list of each scaffolding material’s exact quantity.

What kind of finishing treatment available on your scaffolding materials?

Pre-galvanized planks, Painting, Zinc plating, and Hot-dip Galvanizing processes are available.