The adjustable Bases and Jacks are usually used as the essential supporting parts in the scaffolding systems. The primary function is to adjust the bottom of the system scaffolds to be at the same horizontal level, so the whole system will stay more stable to ensure safety.
And the U heads are used at the top of the scaffolds to support H beams and work together to form the scaffolding shoring systems, which are popularly used for high lift constructions, such as high bridges, tunnels, airport terminals, etc.
WanChengTai(WCT) is a top manufacturer of scaffolding products in China. We manufacture scaffolding systems that encompass the full range of components. With WCT, you can acquire off-the-shelf scaffoldings as well as customized parts for individual requirements.
WCT’s Base & Jacks include but are not limited to the following products.
Still not finding what you’re looking for?
Contact our consultants for more available products.
WCT has manufactured all kinds of products for scaffolds. At one stop, you can get everything you need, from base jacks to board brackets to the platforms.
With more than 100,000m2 of workshops and warehouses, WCT is able to meet your production needs in a timely manner, including urgent orders.
We have more than 20 auto welding lines for scaffolding manufacture as well as four auto forming lines for scaffolding planks in the factory.
The QC executive processes of WCT cover every flow of the production. We handle your orders from raw materials to manufacturing processes to packaging and shipping.
WanChengTai has equipped our factory with more than 20 automated welding lines used for the scaffolding production. And those modern production machines guarantee the quality consistency of our scaffoldings.
Get A QuoteFrom the scaffolding ledgers and standards to the accessories such as base jacks and planks, WanChengTai completes the hot-dip galvanizing treatment in our own workshop. And with these galvanizing lines, we can lower the surface finishing cost, shorten the production period, and improve the galvanizing surface quality.
Get A QuoteWanChengTai takes care of your scaffoldings. Our quality control processes cover every aspect, raw materials, production procedures, mass production, surface finishing, packaging, and container loading. These procedures ensure that our scaffolds are manufactured with high quality, starting with the appearance check to dimensional inspection and mechanical properties test.
Get A QuoteYes. WanChengTai has certificates based on the following standards: ANSI/SSFI SC100 for Ringlock scaffolds; AS/NZS 1576 for Kwikstage scaffolds; AS/NZS 1576 for Aluminum scaffolds; AS 3610 for shoring frames & props.
There are several packaging methods available, including bundles, pallets, racks, and racks with mesh.
Yes. We have a strong technical team with rich experiences. If you have your own design, send us the drawings, and leave the rest operation to us. We will handle it.
Yes, we can. Let us know your request, and we will follow up.
Our capacity is 2000 tons per month. And for regular scaffolds, we can arrange delivery for you within 30 days.
We only take Chinese steel Q345(equivalent to 16Mn) for the scaffolding standards. And for other parts, both Q345 and Q235 are available.
Speaking with solid self-confidence, our price is very reasonable and competitive. Leave us your inquiry, and we will send our price list for your reference.
We are selling our scaffolding piece by piece. It is unavailable for a price per square meter.
We do not have the services of contracting. But you can acquire projects with our scaffolds. We will do our best to assist you.
We can roughly but not precisely make a calculation. But it is just for reference. We strongly recommend talking with your local scaffolding engineers if you want a clear list of each scaffolding material with an exact quantity.
Pre-galvanized planks, Painting, Zinc plating, and Hot-dip Galvanizing processes are available.
Qingdao WanchengTai is the international business department of Qingdao Wancheng Group, which has built up a new industry park with more than 10,000m2. With the modern automated production lines, our capacity of scaffolding materials can reach up to 50,000 tons/year in full condition.
Copyright 2017 – 2022 Qingdao WanchengTai | All Rights Reserved